Sectors, H&W have been enacting a strong recruitment drive that will take its permanent staff levels up by over 60 people. In short, tens of millions of pounds will flow through the local economy." Local engineering firms will have subcontract opportunities for manufacture and supply of services, suppliers will provide vast quantities of materials, hotels and hospitality will accommodate the hundreds of specialist sub-contractors that follow these large contracts, wherever they are awarded. Harland and Wolff have already begun an intense three month period of pre-fabrication where new steel sections will be constructed in advance of the rig arrival.ĭirector of Ship and Offshore Unit Repair, James Lappin said: "This is a significant project for Harland and Wolff and for Northern Ireland. The project will also include numerous standard renewal and maintenance scopes of work such as repairs, renewals and refurbishment of pipework, steelwork, anodes, drilling equipment, electrical systems, propulsion machinery and accommodation areas. Last in Belfast during 2004/2005, this Aker-H3 design semisubmersible drilling rig will have several major modifications and upgrades including the fabrication and addition of two new columns and four buoyancy boxes for stability and deck load improvements, fitting of a new larger BOP requiring underdeck stiffening and the fabrication and installation of a new BOP control house and installation of new drill string handling equipment. Harland and Wolff and Dolphin Drilling will implement an integrated project organization dedicated solely to the successful execution of the project covering the many disciplines, aspects and subcontractors of the scope. Image: The Blackford Dolphin during its 2014 stay at H&W. Harland and Wolff (H&W) have won a contract award for dry docking and renewal/ special periodic survey of the Byford Dolphin mobile offshore drilling unit (MODU) from Aberdeen based Dolphin Drilling.įollowing on the successful completion of its sister rig the Blackford Dolphin in 2014, the Byford Dolphin project is expected to start early 2015.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |